UW Dempsey Indoor Practice Facility

Project 19 of 29

University of Washington Dempsey Indoor Practice Facility — Seattle, WA

University of Washington / Magnusson Klemencic Associates

A detailed, deliberate site design was crucial due to the facility being wedged between UW Husky Stadium and Hec Ed Pavilion and the soil being fill dirt atop murky lake bottom. In addition to site design, LPD provided project management, civil engineering design and construction administration for site utilities, grading, and paving.

Under construction during the Nisqually Earthquake, soils dropped six inches during the earthquake. The newly constructed waterline, designed with telescoping sleeves, remained intact after this event.

Category:

Related Projects